Monday, November 25, 2013

- SAP is the shortened form of Standard Assessment Procedure and is used to assess a dwelling's energy performance.

- Approved Document Part L and Section 6 of the Scottish Building Standards require an SAP calculation to be carried out to demonstrate compliance with energy performance requirements.
SAP calculations are also required to demonstrate energy performance in the Sustainability benchmarks such as the Code for Sustainable Homes and in some planning conditions.

- The earlier the better. DER/TER calculations need to be submitted to building control before work starts on site, however getting them done further in advance will allow for the energy efficiency of the dwelling to be considered whilst it is being designed ensuring a cost effective solution to compliance is achieved.
- EPC stands for Energy Performance Certificate and shows a dwelling's energy efficiency and CO2 emissions. An EPC will also have recommendations on how to improve the property's energy performance.
- Every dwelling for sale requires an EPC to demonstrate the energy performance of the dwelling. We provide EPCs for new build properties only.
- An EPC for new build dwellings is an "As-Built" certificate so the dwelling should be near completion before the EPC is issued. If the dwelling is in a suitable state for an air leakage test to occur then an EPC can be issued.
- SAP is generally a term that describes the design stage DER/TER (Dwelling Emission Rate/Target Emission Rate) Calculation, an Energy Performance Certificate is calculated from an As-Built SAP and represents the dwelling as constructed included an air test result.
- SAP calculations and EPCs require drawings of the dwelling (floor plans, elevations, sections and site plan) as well as a build specification. An EPC will also need an air test result either for the specific or similar dwelling.
- We charge retrospectively for SAP and EPC calculations which means you won't pay for them until they are complete. An account with NHBC is required for retrospective billing.
- SAP calculations submitted for building control should demonstrate the performance of all the dwellings on the site. Due to the number of items that will cause the calculation to vary, a large proportion of the dwellings will require an SAP assessment and builders often have an SAP for every dwelling.  This also helps with a plot specific Predicted Energy Assessment (PEA) and also Code for Sustainable Homes assessments.
- Thermal bridging occurs where insulation cannot be continued. Non linear repeating thermal bridges are caused by wall ties and timber battens etc, and is taken into account in the u-value calculations. Linear thermal bridges occur where two different elements occur such as corners and where the ground floor meets the external wall.
-Accredited construction details are a set of drawings that show how to build specific details in a dwelling to reduce thermal bridging. Building to them will result in lower heat losses through thermal bridging and lower your Dwelling Emission Rate. Other details exist that will allow you to reduce your DER further and your Energy Assessor will be able to help.
- The party wall bypass is where heat escapes from a dwelling through the cavity party wall between dwellings. The heat loss can be prevented by filling and sealing the cavity.

3 comments :

  1. So nice information about SAP Calculations and EPC reports. This Article was really so much helpful to know about SAP Calculations. Thanks for such a nice information. Please visit if looking for Antique Carpets.

    ReplyDelete
  2. good information about SAP Calculations in Uk, nice blog. thank you!
    free articles submit

    ReplyDelete
  3. so nice information about SAP and EPC reports, it is so much important thing when making a building. I appreciate for sharing such a nice informative post.
    credit repair letters

    ReplyDelete